There were 1,292 press releases posted in the last 24 hours and 400,956 in the last 365 days.

Lane Restrictions Next Week on Route 30 at Centerville Road Interchange in Lancaster County

Contractor to mill and pave rumble strips for interchange improvement project; Major delays expected

Harrisburg, PA – PennDOT announced today that work is set to begin next week on Route 30 at the Centerville Road Interchange in E. Hempfield Township, Lancaster County. This work will require lane restrictions which could cause major delays.


Weather permitting, this work will be performed from 9:00 AM to 2:00 PM Tuesday, November 15, through Thursday, November 17. Work includes milling and paving shoulder rumble strips to prepare for a traffic switch scheduled for the night of Sunday, November 20.


On Tuesday, the contractor will begin milling and paving shoulder rumble strips on the eastbound side of Route 30. Traffic will be restricted to a single lane. Once the eastbound side is complete, the contractor will perform the same work on the westbound side, with traffic also restricted to a single lane. 


Motorists are encouraged to find alternate routes as heavy delays are expected. Those traveling through the work zone should be alert and drive with caution.


Then, from 8:00 PM Sunday, November 20 to 6:00 AM the following morning, the contractor will shift traffic to the outside shoulders of Route 30 so work can begin on the center pier of the structure that carries Centerville Road over Route 30. Two lanes of traffic will be maintained in each direction on Route 30 with this traffic pattern.


This work is part of the Centerville Road Interchange Improvement project, which consists of structure replacement, Superpave overlay, base replacement, roadway widening, milling, guiderail improvements, drainage improvements, pavement markings, ADA improvements, traffic signal improvements, and other miscellaneous construction. The project includes work on Centerville Road from Cornerstone Drive to Marietta Avenue (Route 23), and Marietta Avenue from Centerville Road to Stony Battery Road.


JD Eckman, Inc., of Atglen, PA is the prime contractor on this $36.3 million project. Work is expected to be completed by July 22, 2025.


Motorists can check conditions on major roadways by visiting 511PA. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.


511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts.


Subscribe to PennDOT news and traffic alerts in Adams, Cumberland, Dauphin, Franklin, Lancaster, Lebanon, Perry and York counties at PennDOT District 8.


Information about infrastructure in District 8, including completed work and significant projects, is available at District 8 Results. Find PennDOT’s planned and active construction projects at PennDOT Projects.



MEDIA CONTACT: Dave Thompson, District 8 Press Officer, 717-418-5018 

###


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.