There were 1,649 press releases posted in the last 24 hours and 403,294 in the last 365 days.

UAW and GM to start 2011 contract talks

Media Advisory

Date: Wednesday, July 27, 2011

Where: General Motors Detroit-Hamtramck Assembly Plant, 2500 East Grand Blvd., Detroit, MI 48211

When: 10:30 a.m. Plan to arrive no later than 10 a.m. so the program can begin promptly.

Who: GM Chairman and Chief Executive Officer Dan Akerson;  UAW President Bob King; UAW Vice President Joe Ashton; GM Vice President of Labor Relations Cathy Clegg.
What: Kick-off of 2011 UAW and GM Labor Talks.

Format: Brief event on the plant floor. A moderated Q&A session will take place in a conference room with UAW and GM leaders.

Attire: Safety is our overriding priority, so guests need to adhere to the following safety protocol:

  • Shoes must be completely enclosed (no open-toe or open-heeled shoes)
  • No high heels or skinny heels.
  • Full-length pants (no capris, skirts or shorts) are required.

 

Directions: Directions to Detroit/Hamtramck from north and south: I-75  to I-94 East toward PORT HURON. Stay in right lane of I-94 and take first exit - 217A  CHENE ST / E GRAND BLVD. At the bottom of the exit ramp, turn left at CHENE (first traffic light) and cross over I-94.  Turn right at EAST GRAND BLVD traffic light. Stay to left - at 1st opportunity, turn left  (Main Entrance) (BEFORE Detroit-Hamtramck sign).

 

 


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.