There were 1,565 press releases posted in the last 24 hours and 402,409 in the last 365 days.

Glen Eagle's Plant Expansion in Honduras Completed


/EINPresswire.com/ -- MONTREAL, QUEBEC -- (Marketwired) -- 01/26/16 -- Glen Eagle Resources Inc. (TSX VENTURE: GER) ("Glen Eagle" or the "Company") is pleased to announce that Cobra Oro's second development phase to built a cyanide circuit for its processing plant in Honduras has been completed and production is scheduled to start in the coming days.

Under the new plant expansion, maximum daily throughput should reach 70 tons to 80 tons per day due to improved efficiency, greater capacity and availability of softer mineral supplies. The company has added several empoyees to its payroll to meet new production standards and safety requirements; increasing Cobra Oro's workforce to 27 full time workers. Maximum daily throughput will be sustained once the personnel has been adequately trained and the equipment fully tested for better efficiency.

Gilles Laverdiere, P.Geo., a qualified person under NI 43-101 has approved the technical content presented herein.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Glen Eagle Resources Inc.
Jean Labrecque
450-229-4488
www.gleneagleresources.com


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.