There were 1,787 press releases posted in the last 24 hours and 400,275 in the last 365 days.

Travel Advisory: Pavement Improvements on Reservoir Road in Glocester Require Detour Starting July 8

As part of ongoing improvements to Putnam Pike (Route 44) and Reservoir Road in Glocester, the Rhode Island Department of Transportation (RIDOT) is scheduled to close Reservoir Road, from Putnam Pike to Money Hill Road, weekdays from 7 a.m. to 4 p.m. for approximately one month, starting on Monday, July 8.

Access will remain for local traffic, but northbound traffic will be detoured using South Main Street (Route 100). Southbound traffic will not be affected. RIDOT will mill and pave the road and install guardrail and new signs and striping.

All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings and weather.

The Putnam Pike and Reservoir Road pavement project is made possible by RhodeWorks and the Bipartisan Infrastructure Investment and Jobs Act. RIDOT is committed to bringing Rhode Island's infrastructure into a state of good repair while respecting the environment and striving to improve it. Learn more at www.ridot.net/RhodeWorks.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.